Find us on  
TCI Video Gallery
 

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player


Contact Us

  • T.C.I Enterprises (Pvt) Ltd
    No. 181, Nawala Road, Nugegoda. SriLanka
    Tel: + 94 (0) 11 4408927 / 8
    + 94 (0) 11 5335073
    + 94 (0) 11 4404222
    Fax : + 94 (0) 11 2812694
    Email : tciepl@eureka.lk
    Web : www.tcialu.com
plastic-formwork

Products > Metal & Plastic Formwork > Plastic Formwork

Plastic FormworkConventionally, Builders have long been using woden formwork to construct slab, beams, and columns. However woden formwork has limited re-usability and contributed to the wanton destruction of forest. Some builders have now turned to using metal formworks. However, metal formwork has proven to be heavy and unsafe. FUVITECH is pleased to introduce an innovative polymer formwork as a superior alternative to the building industry. FUVITECH formwork is light and safe to woke with and it has high re-usability and is environment friendly.

  • * Quick Installation
  • * Easy Dismantlment
  • * Advanced Technology
  • * High Precision
  • * Heavy Working Condition
  • * Perfect Concreat Surface
  • * Easy Cleaning
  • * Light & Safe for workers
  • * Harmony with Nature

Cost SavingPlastic Formwork

Manufactured from special materials and ingrediants with state-of-the-art technology. It is durable and heavy conditions and can resist. Other naturally occuring conditions like sun, rain etc... With a reuse life of over 100 times, Fuvitech Formwork significally reduces cost in comparison with wooden or metal sheetformwork.

Less labour cost:

Quick installment and dismantlement reduces labour cost. In addition, perfect concrete surface minimises time and labour cost for finishing touch.

Description Fuvitech Formwork Plywood Formwork Metal Formwork
Initial Investment capital for the same formwork area 1 1/3 1.5
Reuse Factor 100 times 3 times 100 times
Maintenance Cost 0 0 25% of initial cost for every 25 times of use (cost replacement Plywood and maintenance frames)
Cost annalysis after 25 times usage No additional investment 1/3x25/3 =2.7 times initial cost 1.5 +1.5x2.5% cost of maintenance = 1.8 times
Cost annalysis after 100 times usage - Cost 2.7x4 =10.8 times initial cost 1.5 +1.5x2.5%x3 cost of 3 times maintenance = 2.6 times
Labour required 1 labour unit 1.5 Labour unit -
Install & dismantle speed 1.5 times faster 1 unit 1 unit

 
Item Code Description
1 MPP020FOO M-Panel 500x1000
2 MPP003FOO M-Panel 100x1000
3 MPP005FOO M-Panel 150x1000
4 MPP006FOO M-Panel 200x1000
5 MPP007FOO M-Panel 250x1000
6 MPP008FOO M-Panel 300x1000
7 MPP003FO1 M-Panel 100x500
8 MPP005FO1 M-Panel 150x500
9 MPP006FO1 M-Panel 200x500
10 MPP006FO2 M-Panel 200x100
11 MPP006FO3 M-Panel 200x250
12 MPP007FO1 M-Panel 250x500
13 MPP007FO2 M-Panel 250x100
14 MPP007FO3 M-Panel 250x250
15 MPP008FO1 M-Panel 300x500
16 MPP008FO2 M-Panel 300x100
17 MPP008FO3 M-Panel 300x250
18 ICP200FOO Inside Corner 70 x 150 x 1000
19 ICP201FOO Inside Corner 100 x 50 x 1000
20 ICP201F01 Inside Corner 100 x 50 x 500
21 ICP203FOO Inside Corner 150 x 150 x 1000
22 ICP203F01 Inside Corner 150 x 150 x 500
23 ICP204FOO Inside Corner Cross 200 x 100
24 ICP204F01 Inside Corner Cross 250 x 100
25 ICP204F02 Inside Corner Cross 300 x 100
© 2011 T.C.I Enterprises (Pvt) Ltd. All Rights Reserved. Site By Lankawebdreams